论文部分内容阅读
某地下车库采用大空间、大跨度框架结构无粘结预应力现浇空心楼盖施工,针对结构体系的独特,采用了满堂碗扣脚手架的施工方法,保证了结构体系的安全与稳定,为混凝土浇筑打下了坚实的基础,使无粘结预应力现浇空心楼盖施工一次成优。
An underground garage with large space, long-span frame structure without bond prestressed cast-in-place hollow floor construction, in view of the unique structure of the system, using full bowl scaffolding construction methods to ensure the safety and stability of the structural system for the concrete Pour laid a solid foundation, so that non-bonded precast cast-in-place hollow floor construction into a superior.