通过对2011年苏里格气田桃2井区地面工程建设施工中管线测量放线和估算管线长度的探讨,利用mapsource软件进行管线预估计和管线线路的提前定线,做到材料最节省、施工最简单,管线沿程损失最少,尽快落实管线线路,为下道工序的施工做充分准备,也为今后的单井管线施工提供借鉴。
Through the discussion of pipeline measurement and pipeline length estimation in ground construction construction of Tao 2 well area in Sulige gas field in 2011, using mapsource software to conduct pipeline pre-estimation and pipeline alignment in advance, the most material saving and construction The simplest, the least loss along the pipeline, the implementation of pipeline lines as soon as possible, to prepare for the construction of the next procedure, but also for future single-well pipeline construction to provide reference.