近年来我单位承接了多台大型矿山提升机设备安装工程,提升机是煤矿四大运转设备之一,是煤矿建设不可缺的组成部分,对它的安装要求标准高,管理细。望峰岗矿井是淮南矿区开采技术条件最复杂的第一对千米深井,望峰岗第一副井设计安装JKMD-4.5×4(Ⅲ)多绳摩擦提升机、JKMD-4×4(Ⅲ)落地式多绳摩擦提升机各一台,针对望峰岗第一副井提升机的主要部件的安装来研究探讨大型矿山提升机的安装工艺。
In recent years, my unit to undertake more than one large mine hoist equipment installation project, the hoist is one of the four operating coal mine equipment, coal mine construction is an integral part of its installation of high standards and fine management. Wangfenggang Mine is the first complex with the most complicated technical conditions for mining in Huainan Mining Area. The first auxiliary shaft of Wangfenggang is designed and installed with JKMD-4.5 × 4 (Ⅲ) multi-rope friction hoist. JKMD-4 × 4 (Ⅲ) ) Floor-based multi-rope friction hoist each one, for the first deputy Wangfenggang elevator hoist the main components of the installation to study the installation of large mine hoist installation process.