呼斯太河流域水土保持世行贷款项目实施期为 8年 ( 1994~ 2 0 0 1年 ) ,总投资 85 0 0万元 ,将完成新增治理水土流失面积 2 0 2 7km2 。截至 1999年底 ,6年共完成治理面积 2 3 5km2 ,提前超额完成了任务 ,项目区水土流失治理程度由2 4%提高到 72 9%,土地利用率由 3 2 %提高到 82 0 %,植被覆盖度由 2 5 %提高到 72 %,土地生产力由 1741元 /hm2 增加到 3 75 0元 /hm2 ,人均收入由 62 8元增加到 2 485元 ,已显示出显著的经济、生态、社会效益
The implementation of the World Bank Loan for Soil and Water Conservation in the Huostai River Basin has an implementation period of 8 years (1994 ~ 2001) with a total investment of 8.5 million yuan, and an additional area of 202.7 km2 for soil erosion and soil loss control will be completed. As of the end of 1999, a total area of 235km2 has been completed in 6 years, exceeding the tasks well in advance. The degree of soil and water loss control in the project area increased from 24% to 72.9% and the land utilization rate increased from 32% to 82%. The vegetation The coverage rate increased from 25% to 72%, land productivity increased from 1741 yuan / hm2 to 3 750 yuan / hm2, and per capita income increased from 628 yuan to 2 485 yuan, showing significant economic, ecological and social benefits