油田油气水井在开发生产过程中,由于受油气水运移及各种应力、腐蚀、地质结构及施工措施诸因素的影响,一方面使新井水泥返高不够,固井质量不合格;另一方面使生产井原固井水泥环遭到破坏,或造成油气层窜通或地层胶结物被破坏,近井地带形成空洞,或因地层出水,套管破漏使油水井不能正常生产。但是在实际固井工作中,由于客观情况的变化,或主观上的工作失误,会出现在注水泥工程中发生井漏、高压、替空、油气水侵窜槽等都会导致固井质量不合格。通过提高挤水泥工艺施工成功率,使固井质量合格,恢复油气水井正常生产,延长油水井的寿命。
Oil and gas wells in the development and production process, due to the migration of oil and gas and water due to various stress and corrosion, geological structure and construction measures of various factors, on the one hand the new well cement back to high enough, cementing quality unqualified; the other hand, The original well cementing ring of the production well was damaged, or the formation of oil and gas layers was flushed or the cement of the formation was destroyed, and the formation of holes in the near wellbore or the outflow of water from the formation resulted in the oil and water wells being unable to be normally produced. However, in the actual cementing work, due to objective changes or subjective mistakes in work, there will be leakage, high pressure, emptying, oil and gas invasion and channeling in the cement injection project, which will lead to the failure of the cementing quality . By improving the success rate of squeeze cement construction, the cementing quality is qualified, the normal production of oil and gas wells is resumed, and the life of oil and water wells is prolonged.