概述东方电机厂自1958年破土兴建,1966年正式开工生产,到1988年年底为止,共生产水轮发电机组149套,总容量7377.soMW(表l),机组安装在国内外61个电站。东方水轮机典型产品的数据列入表2和表3,单机容量逐年增长情况见图1和图2。上述产品中,通过国际投标竟争方式出口12套,共100.loMW,援外8套,共625MW(表4)。此外,我厂还同日本东芝公司合作,
Overview Dongfang Electrical Machinery Plant was built in 1958 and was officially started production in 1966. By the end of 1988, a total of 149 sets of hydro-generating sets were produced with a total capacity of 7377.soMW (Table 1). The units were installed at 61 domestic and overseas power plants. The data of the typical products of Dongfang Turbine are listed in Table 2 and Table 3, and the annual growth of stand-alone capacity is shown in Figure 1 and Figure 2. Among the above products, 12 were exported through competitive bidding in the international market with a total of 100. loMW and 8 foreign aid units totaling 625MW (Table 4). In addition, I also plant with Japan Toshiba Corporation,