在水利工程中,较为常见的一种基础形式就是钻孔灌注桩。由于钻孔灌注桩的施工大部分是在水下进行的,其施工过程无法观察,成桩后也不能进行开挖验收,施工中任何一个环节出现问题,都将直接影响到整个工程的质量和进度,以及经济损失和社会影响。所以在钻孔灌注桩施工的各个不同时期要抓住关键,采用合理的方法和有效的手段,确保工程质量。现就钻孔灌注桩在水利施工中的应用及质量控制展开了探讨。
In hydraulic engineering, a more common form of foundation is a bored pile. Because most of the construction of cast-in-situ bored piles is carried out underwater, the construction process can not be observed and the excavation and acceptance can not be carried out after piling. Any problems during the construction will directly affect the quality of the whole project and Progress, economic loss and social impact. Therefore, in different periods of construction of bored piles, we should seize the key to adopt reasonable methods and effective means to ensure the quality of the project. Now on the application of bored piles in water conservancy construction and quality control are discussed.