盾构空推通过矿山法段隧道相比其他盾构施工工法技术难度为大,类似经验缺乏,尤其是在线路曲线复杂、地下水丰富的工程中对施工技术的要求更高。结合盾构空推施工实践,对盾构空推通过矿山法段隧道进行阐述,同时对施工关键部位的质量控制进行了探讨,可为类似情况下的盾构施工提供借鉴。
Compared with other shield construction methods, shield tunneling is more difficult and less experienced than other shield tunneling methods. Especially in the complicated curve of the route and the groundwater rich project, the construction technology is more demanding. Combined with the practice of shield air-blasting, the shield empty pass was elaborated through the tunnel of mining section, and the quality control of the key parts of the construction was discussed at the same time, which could provide reference for shield construction under similar conditions.