工程机械液压系统初始调试方法

来源 :工程机械与维修 | 被引量 : 0次 | 上传用户:zhangtianyu66
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1.调试前的检查调试前必须先掌握液压系统液压泵、换向阀、溢流阀、节流阀、液压缸、马达等元件的性能、结构、控制原理及相关的技术参数,方可进行调试。(1)检查液压泵先检查液压泵与原动机连接是否牢固,再检查液压泵进、出油管安装是否正确。若进、出油管装反,可能造成液压系统无法形成压力。此外,还应检查胶管是否破损、接头是否紧固,以防从吸油管处吸入空气。液压泵初次使用时,应向液压泵内灌入液压油。 1. Pre-commissioning inspection Prior to commissioning, hydraulic system hydraulic pump, reversing valve, relief valve, throttle valve, hydraulic cylinder, motor and other components must be master of performance, structure, control principle and related technical parameters before proceeding debugging. (1) Check the hydraulic pump First check the hydraulic pump and the prime mover connection is solid, and then check the hydraulic pump into the tubing installed correctly. If into, out of the oil tube, may cause the hydraulic system can not form pressure. In addition, you should also check the hose is damaged, the connector is tight to prevent inhalation of air from the suction pipe. When the hydraulic pump is used for the first time, the hydraulic pump should be filled with hydraulic oil.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
用履带式吊管机进行长线管道吊装作业时,需采用多台吊管机同时起吊。吊管机的驻车制动对保证吊管作业安全非常关键,特别是在起吊大型长线管道且在有坡度的施工现场进行吊管作
挖掘机、推土机等履带式工程机械上的支重轮由于承载负荷大、工况恶劣,经常出现漏油现象。支重轮漏油后不久,便会加剧磨损,直至不能继续使用。绝大部分支重轮漏油是从浮动油
我铁矿现有5台1987年购置的工作质量为460t的WK-10A型电动正铲挖掘机,随着生产任务的逐年增加,为了使其发挥出最大的生产能力,减少挖掘、回转、行走机构摩擦部位的磨损,延长
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
1.传统随车起重机支腿不足现有随车起重机水平支腿断面是由顶板、底板、左腹板及右腹板组焊而成的箱型结构,如图1所示。图1中的黑色部分表示板材焊接时的焊缝。由图1可以看出
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊