从准备用地预审材料到获得预审批复,再到建设项目组卷报批、完成供地,没有一两年时间,一个建设项目很难获得批准开工建设。长期以来,土地审批制度存在的一些问题让项目建设单位有点疲惫,也让管理者有点无奈。这种局面将很快被打破。2016年11月29日,国土资源部部长姜大明一天之内签署第68号、第69号两个部令,修改完善《建设项目用地预审管理办法》和《建设用地审查报批管理办法》。国土资源
From the preparation of pre-trial materials to obtain pre-approval of the project, and then to the construction project volume approval, to complete the supply, without a year or two, a construction project is difficult to obtain approval to start construction. For a long time, some problems existing in the system of land examination and approval have made the project construction unit a little tired and also made the managers a bit helpless. This situation will soon be broken. On November 29, 2016, Jiang Daming, Minister of Land and Natural Resources, signed the two ministerial decrees No.68 and No.69 in a day to revise and improve the Measures for the Administration of Pre-construction of Land for Construction Projects and the Administrative Measures for the Examination and Approval of Construction Land Use. Land Resources