论文部分内容阅读
记者从国家能源局相关人士获悉,按照每年1000万千瓦以上的新增装机速度计算,到“十二五”末,我国风电装机有望达到9000万~1亿千瓦,到2020年中国风电装机将达到1.5亿千瓦。“十二五”期间,我国七个千万千瓦级基地中的甘肃、河北、吉林、蒙东、蒙西
According to the reporter from the National Energy Administration, according to the annual installed capacity of more than 10 million kilowatts, the installed capacity of wind power in China is expected to reach 90 million to 100 million kilowatts by the end of the “12th Five-Year Plan”. By 2020, China’s wind power installed capacity Will reach 150 million kilowatts. During the “Twelfth Five-Year Plan”, Gansu, Hebei, Jilin, Mengdong and Mengxi in seven 10-million-kilowatt bases in China