Optimal coordination of directional over current relays using evolutionary programming

来源 :智能系统学报 | 被引量 : 0次 | 上传用户:hghkjhnnggh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Co-ordination of directional over current relays(DOCR) requires the selection and setting of relays so as to sequentially isolate only that portion of the power system where an abnormality has occurred.The problem of coordinating protective relays in electrical power systems consists of selecting suitable settings such that their fundamental protective function is met,given operational requirements of sensitivity,selectivity,reliability and speed.Directional over current relays are best suited for protection of an interconnected sub-station transmission system.One of the major problems associated with this type of protection is the difficulty in coordinating relays.To insure proper coordination,all the main/back up relay pairs must be determined.This paper presents an effective algorithm to determine the minimum number of break points and main/back up relay pairs using relative sequence matrix(RSM).A novel optimization technique based on evolutionary programming was developed using these main/back up relay pairs for directional over current relay coordination in multi-loop networks.Since the problem has multi-optimum points,conventional mathematics based optimization techniques may sometimes fail.Hence evolutionary programming(EP) was used,as it is a stochastic multi-point search optimization algorithm capable of escaping from the local optimum problem,giving a better chance of reaching a global optimum.The method developed was tested on an existing 6 bus,7 line system and better results were obtained than with conventional methods. Co-ordination of directional over current relays (DOCR) requires the selection and setting of relays so as to to sorted isolate only that portion of the power system where an abnormality has occurred. The problem of coordinating protective relays in electrical power systems consists of of sustainable settings such that that their fundamental protective function is met, given operational requirements of sensitivity, selectivity, reliability and speed.Directional over current relays are best suited for protection of an interconnected sub-station transmission system. One of the major problems associated with this type of protection is the difficulty in coordinating relays. To insure proper coordination, all the main / back up relay pairs must be determined. This paper presents an effective algorithm to determine the minimum number of break points and main / back up relay pairs using relative sequence matrix (RSM). A novel optimization technique based on evolutionary programming was developed using the se main / back up relay pairs for directional over current relay coordination in multi-loop networks. The problem has multi-optimum points, conventional mathematics based optimization techniques may sometimes fail .ence evolutionary programming (EP) was used, as it is a stochastic multi-point search optimization algorithm capable of escaping from the local optimum problem, giving a better chance of reaching a global optimum. The method developed was tested on an existing 6 bus, 7 line system and better results were obtained with with conventional methods.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
企业文化的不同,很大程度上是因为创业企业家个性的不同.中兴和华为以不同的路径取得了同样的成功,殊途同归的关键要素就是其创始人和精神领袖--侯为贵和任正非性格和思想上
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
中兴:分权>集权rn中兴的组织体系构架是典型的团队管理.从1998年起,中兴就陆续将整个公司划分为相对独立的事业部,并引进了矩阵式管理和团队管理.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
中兴:“农村包围城市”之海外版rn2004年,精神领袖侯为贵和新任总裁殷一民等人提出:中兴将有50%销售额来自国际市场,拓展海外市场为中兴的三大战略核心之一.
中兴:没有庸才,只有放错地方的人才rn在中兴,有三条可供选择的跑道,包括管理、技术和业务三条线的职务体系.只要爬到业务或技术线的最高级别,就可以享受和总裁一样的待遇.
中兴:宽容的力量rn中兴的企业文化是一种宽容的人性文化,其总裁殷一民说:“存在的就是合理的.”
期刊