水电站厂房布置应从厂房横剖面入手,先确定水轮机安装高程,根据所选水轮机型号和转轮尺寸,按系列水轮机尺寸比例放大,绘出水轮机转轮,座环,活动、固定导叶,蜗壳断面尺寸及尾水管单线图,绘出机墩和发电机外形图.根据各层布置和结构要求定出厂房其它高程.绘制发电机层平面布置图,根据水轮发电机型号、电站水头确定厂房机组段长度,继之定出厂房的安装场长度、边机组段长度,以确定厂房总长度.厂房宽度分别按厂房水上、水下部分的上下游侧拟定,根据蜗壳、尾水管尺寸、发电机及其辅助的设备尺寸、布置要求、交通道条件等定出厂房宽度,根据设备布置原则与尺寸,绘出其外形图,发电机平面布置图随之完成.根据厂房型式和地形条件决定副厂房的位置,根据电站规模确定副厂房的面积与组成,副厂房的布置由机电要求进行设计
Hydropower plant layout should start from the plant cross-section, first determine the turbine installation elevation, according to the selected turbine size and runner size, according to the size of the series of turbine magnification, draw turbine runner, seat ring, activities, fixed vane, volute cross-section Dimension and single-line diagram of draft tube to draw outline drawing of machine piers and generators according to the layout and structure requirements of each floor to draw other elevation of plant.Plotting layout plan of generator layer according to hydro generator model and power station head The length of the unit section followed by the length of the installation site of the plant and the length of the unit section to determine the total length of the plant.The width of the plant is respectively determined according to the upstream and downstream sides of the aquatic and underwater parts of the plant and the power generation Machine and its auxiliary equipment size, layout requirements, traffic conditions such as the road to determine the plant width, according to equipment layout principles and dimensions, draw the outline of the map, followed by the generator layout plan. The location of the plant, according to the size of the plant to determine the size and composition of the deputy plant, deputy plant layout by the mechanical and electrical requirements for design