论文部分内容阅读
在产业升级的大环境下,建筑信息模型BIM得到越来越多的应用。在2015年广西万达茂一期主题公园屋盖钢结构建造的背景下,进而利用Tekla软件对其在施工阶段的材料进场及施工进度控制进行研究。相较于传统施工管理方法,着重介绍BIM理念对施工阶段的革新,期望对深化设计人员及施工方有一定帮助,最终强化工厂制作与现场施工的交流。
Under the environment of industrial upgrading, BIM has been applied more and more. In the context of roof steel structure construction of Wanda Phase I Theme Park in Guangxi Province in 2015, Tekla software was used to study the material access control and construction schedule control during the construction phase. Compared with the traditional construction management methods, this paper mainly introduces the innovation of BIM concept to the construction stage, and hopes to deepen the designers and construction parties to some extent, and finally strengthen the exchange between factory production and on-site construction.