汉江王甫洲水利枢纽通过国家评估

来源 :人民长江 | 被引量 : 0次 | 上传用户:tuwei0164
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
王甫洲水利枢纽位于汉江干流、老河口市下游3 kW,是衔接丹江口水利枢纽的一个梯级,设计蓄水位88m,装机容量10.9万kW,年平均发电量5.8亿kW·h,改善汉江航道约40k m,远期并对丹江口水电站起反调节作用. 本项工程由华能国际电力开发公司和湖北省合资兴办.引进贯流式水轮发电机组,主要由华能负责;余资由湖北省筹措. The Wangfuzhou Water Control Project is located in the mainstream of the Hanjiang River and 3 k in the lower reaches of Laohekou City. It is a cascade connecting with the Danjiangkou Water Control Project. The designed water storage capacity is 88m with an installed capacity of 109,000 kW and an average annual generating capacity of 580 million kW · h. m, long term and play an anti-regulatory role for Danjiangkou Hydropower Station.This project is jointly owned by Huaneng Power International Development Co., Ltd. and Hubei Province.It is mainly responsible for the introduction of tubular turbine units, which is mainly financed by Huaneng;