金岭铁矿选矿厂细碎筛分后的粉矿,经输送带输送到圆仓输送带,圆仓输送带上有5台电动液压犁式卸料器,把粉矿卸到6个粉矿仓。粉矿仓下部有漏斗,通过输送带给矿机给球磨机均匀给矿。目前,粉矿仓的卸料需要人工操作犁式卸料器的上下行按钮以控制卸料器的升降,实现对每个矿仓的卸料,控制各个粉矿仓的料位。圆仓处工作环境恶劣,卸料时,粉尘大,影响工人的身心健康。由于磨矿属于连续作业,岗位工人
Jinling iron ore beneficiation plant crushing screened powder ore, the conveyor belt conveyor to the silos, silos on the conveyor belt 5 electric hydraulic plow unloader, the powder ore unloaded six powder mines . Funnel lower part of the funnel, through the conveyor to the mill to the ball mill uniform to the mine. At present, the discharging of the powder ore warehouse needs the manual operation of the up and down buttons of the plow type unloading device to control the lifting of the unloading device, realizing the unloading of each ore bin and controlling the material level of each powder bin. The working environment in the warehouse is bad. When discharging, the dust is big, affecting the workers’ physical and mental health. As grinding belongs to continuous operations, post workers