论文部分内容阅读
选煤厂生产控制系统是较为复杂的综合系统,调试过程中要求工程技术人员需具备多方面的知识技能和现场经验,对调试过程中出现的问题进行认真判断分析,然后加以处理。最后对整个过程进行总结,便于以后提高处理问题的能力。
The coal preparation plant production control system is a complex and complex system. During the commissioning process, engineers and technicians are required to have a wide range of knowledge and skills and on-site experience. The problems in the commissioning process are carefully judged and analyzed, and then dealt with. Finally, the entire process is summarized, to facilitate the future to improve the ability to deal with the problem.