盾构刀盘是在盾构掘进过程中起重要作用的部件。为了降低设备采购成本、提高设备的适应性,对适用于软弱地层中的地铁隧道施工的直径6.24m土压平衡式盾构刀盘系统进行改造,以适应单区间长距离全断面砂砾复杂地层工程的施工。介绍改进方案制定、技术工艺实施,并对改造后的刀盘实际掘进效果进行分析研究。实践证明只要改进措施得当,实施工艺合理,不仅可以扩大盾构适用范围,还可以有效提高其掘进性能指标,从而显著提高盾构施工的经济效益。
Shield cutterhead is an important part of the shield tunneling process. In order to reduce the purchasing cost of equipment and improve the adaptability of equipment, the 6.24m diameter earth pressure balance shield cutter system suitable for subway tunnel construction in soft formations was modified to accommodate the single-section long-distance full-face gravel complex strata project Construction. Introduce improvement program formulation and technical process implementation, and analyze and study the effect of the actual cutting of reconstructed cutterhead. Practice has proved that as long as the improvement measures are properly implemented and the technology is reasonable, it not only can expand the scope of application of the shield, but also effectively improve the performance of the tunneling, thereby significantly increasing the economic benefits of shield construction.