论文部分内容阅读
随着广州地铁线路网络化发展,客流大幅增长;同时,受设备限制高峰上线列车数不宜进一步增加;本文基于各种客观因素,结合乘客出行规律现状,以运能、运量最大匹配为目标,对1号线时刻表进行分析,提出优化措施。
With the development of the Guangzhou metro line network, the passenger flow has increased substantially. At the same time, the number of trains on the peak of equipment restriction should not be further increased. Based on various objective factors and the current status of passenger travel rules, this paper aims at the maximum matching of transport capacity and traffic volume, On the 1st line schedule analysis, put forward optimization measures.