SB101高空台,在完成直接排大气总体性能调试和排气冷却器水系统安装调试的基础上,1994年10月着手模拟整个飞行包线范围内的总体枉能调试工作。
SB101 altitude platform, to complete the direct discharge of the overall performance of the air conditioning and exhaust chiller water system installation and commissioning, based in October 1994 to simulate the entire flight envelope within the scope of the overall commissioning of vain.