地下室是建筑工程的基础结构,对地面建筑结构体综合性能有多方面影响,严格控制地下室施工质量是极为关键的。考虑到钢筋混凝土结构承载力布局特点,设置后浇带可以减轻地下室空间承载的力学作用,避免外在力学因素造成的异常隐患。结合后浇带结构作用,本文总结了地下室后浇带设置方法,对后浇带施工技术进行详细分析。
Basement is the basic structure of the construction project, the overall performance of the ground building structures have many implications, strict control of the construction quality of the basement is extremely crucial. Taking into account the layout characteristics of the bearing capacity of reinforced concrete structures, the provision of post-pouring can reduce the mechanical bearing capacity of the basement to avoid the abnormal hidden dangers caused by external mechanical factors. Combined with post-pouring tape structure, this article summarizes the basement after-pouring tape setting method, post-pouring tape construction technology for a detailed analysis.