本文针对北京泰康健康管理研究中心的悬浮幕墙施工过程抗结构变形和温度变形等结构特点和施工难度,详细阐述设计攻关、超长超薄钢板起吊安装方法、超钢结构长细比设计杆件吊装后调直及结构变形控制等关键技术及难点,并通过对施工全过程有限元仿真分析证明,该技术高效、合理,实操性强。
In this paper, Beijing Taikang Health Management Research Center suspended curtain wall construction process of structural deformation and temperature deformation and other structural features and construction difficulty, elaborated the design tackling, ultra-long thin steel lifting installation method, super steel structure slenderness ratio After straightening and structural deformation control and other key technologies and difficulties, and through the construction of the whole process of finite element simulation analysis shows that the technology is efficient, reasonable, practical and strong.