论文部分内容阅读
对于哈牡铁路线路引入哈尔滨枢纽方案,结合枢纽总图规划、客货运情况、城市规划、既有铁路现状、城市交通现状、重大拆迁影响等因素,确定出合理的推荐方案。通过对引入方案的过程分析,阐述了枢纽总图、既有路网、环保要求、市政设施、城市规划、工程数量等对方案选线的影响及重要性。
The Harbin hub project will be introduced to Ha-Mu railway line, and a reasonable recommendation plan will be determined based on such factors as the master plan, passenger and freight traffic conditions, urban planning, existing railway status quo, urban traffic status and the impact of major demolition and relocation. Through the process analysis of the introduced scheme, the general layout of the hub, the influence and importance of the existing road network, environmental protection requirements, municipal facilities, urban planning and the number of projects on the route selection of the program are expounded.