随着青海油田涩北气田百亿方产能建设步伐的迈进,涩北气田地面建设工程管理体制逐步得到了加强和规范,在保障工程安全、质量、工期各方面指标顺利实施的同时,极大地加快了涩北生产一线向标准化、数字化、精品化气田发展的步伐。本文通过对现场施工资料因管理不到位、组卷不规范造成的问题,工程资料保存质量失控的原因进行简单的分许,并提出相应对策,以期实现对工程资料的管理。
With the progress of 10 billion square meters of production capacity in the Sebei gas field of Qinghai Oilfield, the management system of the ground construction project in Sebei gas field has been gradually strengthened and standardized. While ensuring the smooth implementation of the indicators of project safety, quality and construction period, the management system of the Sebei gas field has greatly accelerated Sebei production line to the standardization, digital, refined gas field development pace. In this paper, we simply carry out the subdivision of the on-site construction materials for the reasons of not being in place, the problems caused by the unwinding of the test papers, and the reasons why the quality of the project data is out of control. The corresponding measures are put forward so as to realize the management of the engineering materials.