论文部分内容阅读
随着城市经济的快速发展,园林建设速度的不断加快,园林建设仅仅依靠适宜季节进行树木栽植已经无法满足建设需要。很多园林绿化工程中因为施工时间以及速度的问题,需要在非适宜季节进行树木的移植。因而,如果不注意施工环节,采取有效的技术措施,那么就会对移植树木的成活率以及绿化效果产生影响。本文主要就非适宜季节移植树木进行了探讨。
With the rapid development of urban economy, the speed of landscape construction is accelerating. The construction of landscape architecture can not meet the needs of construction simply by relying on suitable seasons for tree planting. Because of the construction time and the speed of many landscaping projects, the trees need to be transplanted in non-suitable seasons. Therefore, if we do not pay attention to the construction process and adopt effective technical measures, then the survival rate of the transplanted trees and the greening effect will be affected. This paper mainly discusses the non-suitable season of transplanting trees.