介绍了巴西坎普斯诺武斯混凝土面板堆石坝和880 MW水电站的溢洪道用三维有限元法进行设计的情况。建议采用这种方法优化复杂的混凝土结构,以降低建设费用。
This paper introduces the design of the spillway of the Camposnorth concrete facing rockfill dam in Brazil and the 880MW hydropower station using the three-dimensional finite element method. This method is recommended to optimize the complex concrete structures to reduce construction costs.