论文部分内容阅读
一、炼锌厂的发展1.设计内容: 1959年设计的本厂锌的年产量为35,000吨,每24小时需燃烧94长吨(95.5公吨)的碳。这是当时鼓风炉的标准设计。当时曾建设了下列设施: a、一个贮量为15,000吨的矿仓。b、一个烧结车间,装设有一台每24小时生产350吨烧结块(45%Zn和20%Pb),烧结
I. Development of Zinc Smelting Plant 1. Design Content: The designed annual output of zinc in our factory in 1959 was 35,000 tons, burning 94 tons (95.5 tons) of carbon every 24 hours. This was the standard design of the blast furnace at the time. At that time, the following facilities had been constructed: a. A 15,000-ton mine. b. A sinter plant equipped with a 350 tonne sinter block (45% Zn and 20% Pb) produced every 24 hours, sintered