论文部分内容阅读
地质条件极其复杂的砂卵石基础帷幕灌浆界面高程确定的合理性影响到工程质量、投资及工期。通过对前期地质勘探资料、灌浆实验成果及施工过程中取得地质资料进行比较分析,对岳城水库主坝右岸砂卵石基础帷幕灌浆界面高程的确定过程进行了分析总结。
The rationality of determining the elevation of the curtain grout interface with extremely complicated geological conditions affects the project quality, investment and construction period. Through the comparison and analysis of previous geological exploration data, grouting experiment results and geological data obtained during construction, the process of determining the elevation of sandstone foundation curtain grouting at the right bank of Yuecheng Reservoir is analyzed and summarized.