论文部分内容阅读
全预制装配整体式剪力墙结构是当前高层建筑工程中所应用的主要剪力墙形式,它是在剪力墙结构的基础之上,根据对剪力墙、电梯井、柱、阳台、空调板、雨棚等组成成分采用工厂化预制生产的方式,在施工现场进行吊装、注浆管浆锚节点现浇形成整体式剪力墙结构,该剪力墙结构能够在一定程度上减少能源的消耗以及建设对环境的影响。本文通过对全预制装配整体式剪力墙结构节点连接施工技术特点和适用范围以及技术流程等进行详细的说明,希望能对今后工程中全预制装配整体式剪力墙的应用提供一些帮助。
Fully prefabricated monolithic shear wall structure is the main form of shear wall used in the current high-rise building. It is based on the shear wall structure, according to the shear wall, elevator shaft, column, balcony, air conditioning Board, canopy and other components of the factory prefabricated production methods, hoisting at the construction site, grouting pipe anchor node pouring to form an integral shear wall structure, the shear wall structure can reduce energy to some extent Consumption and construction impact on the environment. In this paper, the whole prefabricated monolithic shear wall structure of the node connection construction technology features and scope of application and technical processes are described in detail in the hope that future projects can be fully prefabricated monolithic shear wall to provide some help.