四川省2012年地质灾害防灾预案发布

来源 :资源与人居环境 | 被引量 : 0次 | 上传用户:cslxml
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
目前,《四川省2012年地质灾害防灾预案》正式发布。《预案》综合分析认为,今年四川省汛期由降雨、洪水引发的地质灾害在川西高原大部、川西地区、盆地东北部、北部及地震火区偏重,其余地区与常年接近。另据四川省气候中心预测,盆地东北部地区和盆地西北部地区在汛期将会出现3~4次阶段性强降水过程,洪涝较常年偏重,强降水过程也是四 At present, “Sichuan Province in 2012 geological disaster prevention plan” was officially released. According to a comprehensive analysis of the “plan”, the geological disasters caused by rainfall and flood during the flood season in Sichuan Province this year are mostly concentrated in the western Sichuan Plateau, western Sichuan Basin, northeastern and northern parts of the basin and the earthquake fire area, while the remaining areas are close to the perennial. According to the Sichuan Climate Center, it is estimated that there will be 3-4 stages of heavy rainfall in the northeast of the basin and the northwestern part of the basin in flood season. Flooding is heavier than normal years and the process of heavy precipitation is also four
其他文献
由于信息攻击会毁坏平民生活的基础设施,“敲击效果”会形成不成比例的攻击,误导指挥控制系统打击受保护物体而给国际人道法带来更复杂的问题。作为国际人道法基本原则的限制
本刊讯近日,长江三角洲检测机构发展与合作论坛第十一届年会在江苏无锡召开。在此次论坛上,上海市计量测试技术研究院、绍兴市质量技术监督检测院等单位代表围绕本届年会"携手
无论是资源的组织管理还是资源的检索定位,迄今为止关于虚拟物流资源组织管理以及资源检索定位的研究成果仍然具有一定的局限性,大多数还处在定性研究层面上,与实际应用还有
建筑工程施工图预算审核是合理确定工程造价的必要程序及重要环节.笔者结合多年的工作经验,着重分析了在施工图预审审核中应重点把关的四方面内容:工程量、分部分项工程量清
5月23日9时,国家减灾委、民政部针对江西、湖南、广东、广西、海南、贵州、云南等地可能发生的暴雨洪涝和地质灾害,紧急启动国家救灾预警响应,指导地方民政部门及时做好灾害应急
合肥大剧院是国家建筑节能试点示范工程,在设计、施工过程中严格按照国家公共建筑节能设计标准进行,其节能技术的应用在国内剧院建设中处于领先水平。
电气安装工程主要由缦管、缦盒的预留预埋,管内穿线,电缆敷设,照明器具安装配电箱(柜)的安装,设备接线,防雷接地安装,电气系统调试等几个分项组成.
现代化教学工程的启动和实施为课堂教学带来了生机与活力,在现代化教学条件下进行课堂教学设计是教师面临的一个全新课题,本文结合作者的教学实践,用现代教育的观念和思路对
1.问题的目标性。教师在上课时头脑一定要清楚,这节课到底要让学生获得什么?不是说一节课热热闹闹就行了,这节课结束的时候学生到底有什么收获?是知识的、能力的还是价值观方面的,
据中国新闻网消息,5月10日甘肃定西市发生雹雨山洪泥石流灾害,截至5月18日3时统计,灾害已造成56人遇难,引发全国关注。大部分灾区当日降雨量仪30毫米,一场冰雹大雨为何造成如