前言 根据石油部炼油规划设计院所下达的科研规划,委托华东石油学院负责,北京炼油设计院协助,对房—京重油管线二热支线投产前进行应力、位移测试,这一任务在北京第二热电厂支持下,已于1977年10月底完成。参加工作的有华东石油学院力学教研室岳伯谦、王修斋、潘祖瑾、卢修献、蔡强康;北京炼油设计院陆万林,彭国庆、兰有亭等。报告由蔡强康整理执笔。
Preface According to the scientific research plan issued by the Ministry of Petroleum Refinery Planning and Design Institute, commissioned by East China Petroleum Institute, Beijing Refining Design Institute to assist in the Beijing-Beijing heavy oil pipeline two hot branch production before stress and displacement test, the task in Beijing second With the support of the thermal power plant, it was completed by the end of October 1977. To participate in the work of the East China Petroleum Institute of Mechanics Yue Boqian, Wang Xiuzhai, Pan Zujin, Lu Xiuxian, Cai Qiangkang; Beijing Refining Design Institute Lu Wanlin, Peng Guoqing, Lan You Ting and so on. Report by Cai Qiang Kang finishing write.