通过比选既有建设项目管理模式的优缺点,结合我省实际情况,对我省“‘十一五’及到2020年地方铁路发展规划”中新建第一条柴达尔至木里地方铁路建设项目管理模式进行了研究,提出了项目法人制项目管理模式,分析了项目法人制项目管理模式的特点和适应性,达到了提高柴木地方铁路的建设管理水平的目的。
By comparing the advantages and disadvantages of the existing construction project management mode with the actual situation in our province, the construction of the first local railway construction in Qidal to Muli in our province during the Eleventh Five-year Plan and the Development Plan for Local Railways by 2020 Project management mode was studied, and the project management model of project legal person system was put forward. The characteristics and adaptability of the project management mode of project juristic person system were analyzed and the purpose of raising the construction management level of local railway in Chai Mu was achieved.