针对钒钛磁铁精矿烧结强度差、返矿率高而影响产量、增加烧结加工费的实际问题,采取优化配料与工艺参数控制,改进工艺设备,实施环冷机雾化水冷却、松料器通压缩空气新技术,提高了烧结矿强度;同时,优化成品系统运行,对成品矿运输与筛分系统进行技术改造,降低烧结矿转运落差,减轻冲击、摔打、粉化;缩小高炉槽下筛子筛孔间隙,取消部分球团过筛,高炉回收使用返矿中大于5mm粒级的小烧结矿,改进回收系统等。采取这些措施减少了返矿量,降低返矿率2.03%,增加烧结矿产量24.67万t。
Aiming at the practical problems of poor sintering strength of vanadium-titanium magnetite concentrate, high return rate of ore, influencing output and increasing sintering processing cost, the optimized ingredients and process parameters are adopted to control the process and equipment. Through the new technology of compressed air, improve the strength of sinter; the same time, optimize the operation of the finished product system, technological transformation of finished ore transport and screening system to reduce the sinter transport drop, reduce the impact, beat, powder; Sieve clearance, part of the sieve to remove the sieve, the blast furnace to recover the use of ore back more than 5 mm particle size of small sinter, improve the recovery system. Take these measures to reduce the amount of ore returned to reduce the rate of 2.03% ore return, increase 246,600 tons of sinter production.