贵阳复杂地质条件下某超高层建筑结构设计

来源 :建筑结构 | 被引量 : 0次 | 上传用户:yuhui269
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
贵阳市中心某棚户区改造项目中双塔超高层建筑采用钢筋混凝土筒中筒结构体系。基于场地非常复杂地质情况的综合分析,进行了建筑选址和地下室深度的优化,介绍了东西两塔楼的基础选型和溶洞处理。详细分析了结构在50年风荷载和地震作用下的主要设计指标:自振周期、剪力、侧向位移、最大层间位移角及倾覆力矩。结果表明,本项目的设计能够满足既定的抗震性能目标。 Guiyang downtown shantytowns a transformation project in the twin towers of high-rise buildings using reinforced concrete tube in the tube structure system. Based on the comprehensive analysis of the complicated geological conditions of the site, the optimization of site selection and basement depth was carried out. The foundation selection and cave treatment of two towers in East and West were introduced. The main design indexes of the structure under 50 years of wind loads and earthquakes are analyzed in detail: natural period, shear force, lateral displacement, maximum inter-story drift angle and overturning moment. The results show that the design of the project can meet the established goal of seismic performance.
其他文献
目的 探讨脑梗死后功能训练时机与疗效间的关系.;方法将入选的156例颈内动脉系统脑梗死患者随机分为A、B、C;3组,每组52例,分别于发病后7;d以内、7~30;d、30;d后进行功能训练.3个月后进行疗效评定.;结果;A、B两组疗效相近(P>0.05);两者与C组比较,疗效明显优于C组(P<0.05).;结论脑梗死后7~30;d进行功能训练更为有利,这样,在取得满意疗效的同时可以避免过早功能训练