论文部分内容阅读
本文介绍了南通节制闸在液压启闭系统改造过程中如何保证水闸不间断运行、保证引排水工作正常进行所采取的改造方案,重点阐述了系统改造的内容、时间节点的控制、改造阶段的划分、改造施工的工序、改造中闸门运行的方法等,为类似水闸液压启闭系统改造工程提供参考。
This paper introduces how to ensure the non-stop operation of sluice during the hydraulic hoist system reform and ensure the normal operation of drainage work. The contents of the system reform, the control of the time node, the division of the reconstruction stage , Renovation of the construction process, the transformation of the gate operation methods, similar to the hydraulic gate opening and closing system improvement project to provide a reference.