对河口水电站建于1965年,装机容量为1680kw(一台为1360kW,一台为 320kW)。针对1360kW机组装机容量偏小,设备严重老化及电网峰谷电价差距较大,电站于2000年初对1360kW机组增容至2000kW,机组实行计算机监控,有效地提高了机组工作效率、电站的自动化程度以及电站的经济效益。
The Hekou Hydropower Station was built in 1965 with an installed capacity of 1680kw (one for 1360kW and one for 320kW). For 1360kW unit installed capacity is too small, serious aging equipment and power grid peak-valley price gap between power plants in early 2000 to 1360kW unit capacity to 2000kW, the unit to implement computer monitoring, effectively improve the unit efficiency, power plant automation and The economic benefits of power station.