新城金矿主溜矿井曾发生塌落事故 ,造成了主竖井矿石提升系统的瘫痪 ,严重影响了矿山生产任务的完成。为尽快恢复主竖井矿石提升系统的正常生产 ,在主溜矿井的修重过程中 ,采取了一系列行之有效的施工措施 ,确保在最低限度影响生产的前提下 ,成功地修复了主溜矿井
Xincheng gold mine slipped accident occurred in the main slip mine, causing the main shaft ore lifting system paralyzed, seriously affected the completion of the mine production tasks. In order to restore the normal production of the main shaft ore lifting system as soon as possible, a series of effective construction measures have been taken in the process of rebuilding the main sloping mine to ensure that the main sloping mine has been successfully repaired with minimum impact on production